EPC Contractor


  • Construction of foundation for MW class turbines having own construction equipment's. Batching plant of size ranging 20CM/HR to 60 CM/HR. Transit mixer, Concrete Boom Placer &other related infrastructure
  • Supply, Erection &Commissioningof GSS (Grid Substation) up to 400KV for utilities & windfarm developer
  • Transmission line up to 220KV level for windfarm, Hydro & solar developer
  • Installation of MW wind turbines with tools & equipment
  • Supply, Erection & commissioning for WTG unit substation, 33KV Transformer D. P. Yard and 33KV transmission network
  • Construction of road, culvert & crane pad for MW class wind turbines